How to Prepare a Warehouse for the Seasonal Peak

2026-11-13 | 10 min Logistics and Manufacturing

Seasonal peaks in the warehouse require the alignment of capacities, inventory, and outbound shipments; a properly configured WMS helps coordinate replenishment, picking, and task sequencing based on carrier deadlines.

A seasonal campaign can quickly increase both order volumes and the effort required to process them. The warehouse must handle replenishment, picking, packing and handing shipments over within the agreed timeframes. Preparation therefore starts with analysing the expected workload and checking the capacity of the entire flow. A WMS can help coordinate these processes if its rules are based on the actual order profile and operational capabilities.

Before the Christmas season, a sale or a major marketing campaign, attention often focuses on product availability and adding staff. Even a well-stocked warehouse can fall behind if the most popular item remains in reserve storage, orders wait to be packed or picking starts too late before the carrier departs.

A seasonal peak therefore tests how well warehouse operations connect. It is important to know where increased demand creates additional work, which process can absorb it and when priorities or customer delivery dates need to be adjusted.

Order profiles determine the workload created by a campaign

Seasonal performance forecasts can draw on previous sales, but order counts alone provide only part of the picture. A single-item basket, an order containing items from multiple warehouse zones and a shipment containing fragile goods require different numbers of tasks and different completion times. When their proportions change, the warehouse workload changes even if the total number of orders stays similar.

A useful starting point is therefore the orders from a comparable campaign, supplemented by current operational data. When analysing them, it is useful to track:

  • the number of different items and units in each order,
  • the warehouse zones each order passes through,
  • how often each item is picked,
  • the effort required for checking and packing,
  • the time an order is received and its required dispatch date,
  • the carrier and its cutoff time.

An SKU, or stock keeping unit identifier, helps distinguish which products generate the most picking tasks. A product with a high sales value may not create the same warehouse workload as a cheaper item that staff pick for a large number of orders.

The marketing plan must also inform preparation. A discounted bundle changes the mix of items in a basket, a gift adds handling work, and a time-limited promotion can concentrate incoming orders within a few hours. The warehouse needs this information in time to estimate the workload in each zone and at each packing station.

The capacity plan must cover the entire order flow

Once orders are divided into groups, the time needed to process them can be estimated. For each group, use measured performance for representative work: from picking through consolidation, meaning bringing together items from multiple zones, to checking and packing. Available capacity includes the hours of workers who can actually perform the relevant operation.

Measurement should also account for ordinary work interruptions. The highest output achieved in a single hour may not be sustainable for an entire shift. Calculations should also use a consistent method so the same idle time is not included in an operation’s duration and then subtracted again from available hours.

Example: picking prepares 240 orders per hour, while packing can handle 180 orders with the same profile. If this difference persists, 60 orders accumulate in front of the packing stations every hour. The warehouse therefore needs to adjust work release or packing capacity. These figures illustrate how processes connect; they are not a general performance standard.

Looking at warehouse throughput and the link to dispatch helps reveal where planned volume falls short in terms of completed shipments. Before a campaign, it makes sense to assess both normal and increased demand and add a scenario involving a delayed delivery or fewer available workers. The result should define the conditions under which the warehouse needs extra capacity or changes to delivery dates.

Seasonal bestsellers change storage locations and replenishment

A product promoted by a campaign can quickly deplete stock at its picking location. If replenishment starts only after the location is empty, workers wait for stock even when there is enough in reserve storage. Before the peak, compare expected consumption with the location’s capacity and the time needed to replenish it.

With the right configuration, a WMS can evaluate available stock, order demand and tasks already in progress. Based on this information, it can create a task to move goods from reserve storage to the picking zone. Rules must account for the destination location’s capacity and whether an existing task is already addressing the same need.

System settings must reflect the physical operation. Replenishment requires available equipment, safe access to the aisle and confirmation that the goods have been put away. Creating a task does not by itself mean the stock is ready for picking.

Streamline Logistics and Warehouse Management with EMANS WMS

Gain better visibility into your supply processes, simplify day-to-day logistics operations, and make more efficient use of your warehouse capacity.

Contact us

A temporary change of location can also help with seasonal items. The decision should account for picking frequency, replenishment and workers sharing the area. Placing all bestsellers in one aisle can shorten routes but can also create a congested area. The suitability of the change should therefore be assessed across the entire handling flow.

Carrier cutoffs must be reflected in the sequence of warehouse work

The carrier’s departure sets the time by which the warehouse must prepare a shipment for handover. Before then, the following may still be required:

  • labelling,
  • sorting,
  • checking the documentation
  • or moving the shipment to the dispatch area.

The internal completion deadline must leave time for these operations as well.

The remaining work on an order is therefore important when setting priorities. A basket with items from three zones may need to be started earlier than a simple order for the same collection. A WMS can reflect these differences in task order if it has the relevant deadlines, order data and management rules.

Before the campaign, confirm collection times, capacity limits and procedures for changes with the carriers. The time buffer should be based on measured process times and their variability. If planned volume exceeds warehouse or transport capacity, the sales team and customer support need to adjust communicated delivery dates in time.

Receiving and returns also need capacity during peak periods

Higher dispatch volumes may use the same space, equipment or workers as receiving deliveries and processing returns. Planning should therefore identify which resources are shared and when the different flows will overlap. Late receipt of seasonal stock can create additional workload just as the warehouse is preparing for collection.

Orders need to be checked and prepared for picking, and this must be included in the plan. If an item is sold before the stock is physically available, the customer delivery date must account for this part of the process.

It is useful to reserve space and capacity for identifying, recording and assessing the next steps for returns. Leaving unlabelled goods in storage increases the risk that they will block space needed for outbound shipments. The rules for managing returns through reverse logistics should remain usable during seasonal peaks; capacity allocation needs to reflect this.

Seasonal teams need clear tasks and support with exceptions

It makes sense to assess staffing levels together with workers’ skills. Temporary staff may handle standard picking independently, while resolving a stock discrepancy, damaged item or unknown batch requires an experienced worker. The shift schedule must therefore cover routine operations and support for exceptions.

Training should cover how to use the terminal, confirm the correct location and item, and handle a stopped task. Before the campaign starts, rehearse a stock shortage, order cancellation and equipment failure. For each situation, it should be clear who decides what happens next and how the change is passed to other systems.

When tasks are divided between ERP and WMS, verify that order statuses are transferred as well. Customer support needs to distinguish between order receipt, release to the warehouse, packing completion and handover to the carrier. This makes it possible to communicate a status based on the operation actually completed.

A trial run shows where the plan needs adjustment

The rehearsal should use a representative order profile. A test set built from anonymised operational data can include different warehouse zones, packing types and dispatch deadlines. It is important to check picking, replenishment and packing happening at the same time, including situations where work stops.

The results should identify the constraint, the action and the person responsible. If there is a packing issue, check the workstations, packaging and skills; if item data is incorrect, correct the data. After changes are made, repeat the verification using comparable orders.

If little time remains before the campaign, prioritise measures that can be implemented and tested beforehand. Confirming collections, securing packaging or adjusting replenishment thresholds may be feasible sooner than a larger automation project. Before the rush, avoid unplanned changes to procedures and settings that could invalidate the rehearsal results.

During the campaign, monitor waiting time and on-time performance

The prepared plan must be continuously compared with actual operations. The shift supervisor needs to see how much work is arriving, where it is accumulating and which shipments can still be completed before collection. A practical overview may include these indicators:

Indicator

What it helps assess

Incoming orders by time interval and profile

Difference between planned and actual workload

Number and age of orders waiting to be packed

Bottleneck in the downstream process

Waiting time for replenishment of picking locations

Availability of seasonal items for current work

Number of unfinished orders by collection

Risk of missing the dispatch deadline

Share of shipments handed over on time

Overall reliability of dispatch

Error rate and time needed for corrections

Capacity consumed by rework

Findings should lead to a specific decision about priorities, staff allocation or order release. A brief handover between shifts helps preserve the measures already agreed. After the campaign, compare scenarios with actual results and update the materials for the next season.

Warehouse readiness is reflected in completed shipments

A warehouse is ready for a seasonal peak when it has verified how expected orders will move through each process and can respond to deviations. Inventory, workers, workstations and collections must all align with the same plan. This approach makes it possible to identify early where capacity needs to be increased and where work organisation should change.

EMANS WMS supports inventory management, picking, operator work and warehouse flows. When preparing for seasonal operations, it is important to verify how the specific configuration uses inventory, order and deadline data. Its benefits can then be assessed by whether the warehouse can complete the planned volume at the required quality and within the agreed timeframe.

Frequently Asked Questions

This applies when basic information about the campaign and the supported product range is available. The schedule should allow time for order analysis, confirmation of deliveries and collections, staff training, and a trial run. The required lead time depends on the scope of changes within the specific warehouse.

The number of orders must be supplemented with details regarding their composition and timing. Key factors include the specific items and quantities in the shopping cart, warehouse zones, packing complexity, operational durations, and carrier schedules. Data from previous periods should be adjusted to account for current campaigns, team availability, and planned inbound shipments.

If operations are constrained by staff availability, strengthening the team can help. However, it is also necessary to assess capacity regarding packing, replenishment, equipment, and transport. The number of additional personnel should be based on the specific bottleneck and the skills required to resolve it.

Adjustments to priorities or replenishment limits may be necessary depending on the current workload. These should be carried out within a tested scope and with clearly defined responsibilities. More extensive changes to picking strategies, integrations, or workflows require validation before the start of a campaign.

Replenishment should begin sufficiently in advance so that the stock at the picking location covers consumption during the preparation and transport of additional goods. The limit must be set based on expected demand and the actual replenishment lead time. Factors such as consumption fluctuations, location capacity, equipment availability, and tasks already in progress must also be taken into account.

Starting from the confirmed handover time to the carrier, all remaining operations—including waiting times and an appropriate buffer—must be planned in reverse. The customer order cutoff time must align with the capacities of both the warehouse and the carrier. Different order types may require different lead times; these are determined by measured durations and current workload.

The readiness of processes, data, integrations, and personnel is the deciding factor. Before the full-scale rollout, time must be set aside to verify operations under expected load. If the schedule does not allow for sufficient testing, training, and stabilization, it is advisable to consider a later deployment date and prepare for the upcoming peak period within the existing environment.

First, it is necessary to identify the process that constrains the completion of shipments and examine available measures, such as reallocating trained staff, setting up an additional workstation, or securing an extra pickup. If the deadline still cannot be met following these adjustments, the customer commitment must be updated. The release of further work should be aligned with the capacity of subsequent processes.